Head Coach Barry Shelton requested a site visit at their field to discuss adding a new scoreboard. He was interested in a 28’ long scoreboard installed on new steel I beams in left field.
The sales associate assessed their facility and let the customer know that they could save over $6000 by reusing the existing steel structure.
After the meeting, Time Technologies created numerous conceptual drawings for the coach’s approval. in January of 2014 Time Technologies removed the old scoreboard and installed the new Fair-Play Scoreboard. The truss sign is 4’ at the peak with a custom cutout baseball. Notice the addition of the LED Eyes in the eagle head.