

At a Glance
- Client: Forest Middle School
- Location: Forest, VA
- Project Time: 2026
About The Project
Forest Middle School partnered with Time Technologies to upgrade its exterior signage with a modern electronic message center designed to improve school-to-community communication. As a trusted regional leader in turnkey LED sign installations, Time Technologies managed the project from initial coordination through final installation and on-site training.
The objective was to provide a highly visible, easy-to-manage signage solution that allows school administrators to share announcements, event information, and important updates in real time.
Scope of Work
Time Technologies delivered a complete electronic message center installation that included:
- 2’ x 8’ 10mm Thinksign Electronic Message Center (EMC)
High-resolution LED display offering clear, vibrant messaging with dependable performance in all lighting conditions. - 2’ x 8’ Internally Illuminated Top Sign Cabinet
Permanent school identification with professional backlit visibility to enhance campus presence. - Turnkey Installation Services
Including footer/foundation work, structural steel, permitting coordination, and hands-on training for school staff.
Results
The completed installation provides Forest Middle School with a modern, reliable communication platform that strengthens campus visibility and improves outreach to parents, students, and the surrounding community.
By delivering a seamless turnkey solution, Time Technologies ensured efficient project execution, structural integrity, and long-term performance.
Based in Roanoke, Virginia, Time Technologies is the go-to provider for electronic message centers and school LED sign installations throughout Virginia, Maryland, North Carolina, and West Virginia.






