
Time Technologies was contracted to design and install a new Electronic Message Center (EMC) along with a custom routed top sign for Church on Main. This turnkey project delivered a fresh, modern way for the church to connect with its community.

Time Technologies provided a fully integrated solution—from engineering and fabrication through installation—ensuring the scoreboard and signage not only looked impressive but delivered reliability, durability, and long-term performance in high-use outdoor environments.
The project included the design, fabrication, and installation of: